Waite Hill Road Bridge Replacement
karin • August 4, 2020
B&B made way for a replacement of the Waite Hill Road bridge.
Overall, this was a clean and successful project. Above all, everything was completed without disturbing adjacent nature!




After B&B's demolition of the attached pedestrian bridge passing over Lathrop Street, building demolition begins on Scaife Hall. This project is no simple task due to the numerous auditorium style classrooms and close nearby neighbors, but B&B's high reach excavator makes a our work look easy. Operators Matt Wallack, Jason Fondale, Josh Tarr, and Andrew Hawkins with their lengthy experience will be able to maneuver the tricky Pittsburgh hillside alleys with our multiple excavators and skidsteers just as effortlessly as the adjacent passing traffic.